Wessling – Moosgraben

Creating a cut-off wall by sheet piles and a trafficable dyke route

Construction time period:

06/2009 until 12/2009

Remedial measures
Dike waterproofing by means of a 165 m long sheet pile wall
Producing a dike navigable path over a length of 650 m

Services
Local construction supervision
Measuring and auditing
Cost and schedule monitoring
Supplementary audit
Assisting in the acceptance
Monitoring the elimination of defects