Vienna (Austria) – Connection geothermal plant
Line (steel casing pipe) between the former airfield Aspern and the geothermal plant Niklas-Eslarn-Straße
Vesting period:
Construction time period:
Pipe diameter:
Casing pipe:
Length of marked-out route:
01/2011 until 09/2011
still open
2 x DN 300 steel casing pipe
2 x DN 700 up to DN 1000 St
2.485 m
Parameter
Design pressure:
Design temperature:
Operating pressure:
Operating temperature:
x
PN 40
180° C
22,5 – 28,5 bar
160° C
Services
Implementation planning for Underground and Pipeline Construction
Static tube
Implementation planning for shafts
Mass determination