Thalham – supply water pipe
Rebuilt of supply water pipe ZW6 – Thalham
Construction time period:
Pipe diameter:
Length of marked-out route:
Length of groundwater conservation:
pipe cover:
04/2012 until 11/2013
DN 1600 StSwKaZm
1.445 m
approximately 1.000 m
1,50 up to 4,00 m
Services
Supportive supervision
Details
– Railway crossing by pipe jacking through Closed-face shield, in groundwater
– In the area of open construction, groundwater conservation by filter wells and
xopen drainage
– Creation of headers from pipe segments
– Creation of transitional pieces DN 1600 St on head lying oval profiles 1700/1800
xand 1000/800