Teufelsbruck – Concrete restoration Innkraftwerk
Repair of transformer tubs in the switchgear
Construction period:
11/2003 until 04/2004
Taken measures
Renewal of the head wall of the transformer tub
Enlargement of the transformer drip pans
Production of a new fire wall between the two transformers
Renewal of the transformer tray drainage
Rehabilitation of concrete surfaces of the transformer tubs, floor, walls and joists
Applying an oil-resistant plastic coating on the concrete surfaces
Services
Supervision after the approval of planning
Measuring and auditing
Cost and schedule monitoring
Supplementary audit
Contribute to the inspection
Monitoring the elimination of detected defects