Stuttgart – Train Station
Groundwater management at the station construction site “Stuttgart 21”
Vesting period:
Construction time period:
Used lines:
Total Length:
10/2010 until heute
12/2010 until heute
up to DN 150 preinsulated pipes
approximately 17.000 m
Services
Implementation planning for pipeline construction
Implementation planning for the elevation line
Static calculations of line elevations
Particularity
Sleeves welds by higher stability requirement
Partly 6 tubes next to and above one another