Pullach – dike rehabilitation
dike rehabilitation at the hydroelectric power station Höllriegelskreuth and Pullach
construction time:
length of rehabilitation:
10/2003 until 12/2003
4,4 km
rehabilitation measures:
broadening of the dyke foot
applying a geotextile bentonite
establishment of a narrow wall at the dike foot
create a dike defense path on the dam crest
scope of service:
local construction supervision for the preparation of the sample wall
monitoring of production parameters
monitoring of the sample wall preparation
implementation of oversizes
audit of accounting
cost control
supplementary audit
contribute to the decrease