Passing under the Würm- and Nymphenburg-Biederstein-ditch by horizontal directional drilling

Vesting period:
Pipe diameter:
Protective tube:
Length of marked-out route:
Length of horizontal directional drilling:
Design data:

2010
2 x DN 100 Flex
2 x DA 355 PE
ca. 220 m
ca. 140 m
PN 25, 150°C

Services
Implementation planning for Underground and Pipeline Construction
Implementation planning for lowering shaft
Superior construction supervision
Traffic planning
Dewatering and water right application