Baierbrunn – Concrete repair weir phase III

Concrete repair weir – construction phase III

Construction time period:

08/2004 until 07/2005

Remedial measures
Producing a navigable with heavy-duty vehicles dam with installation of a diffuser for the rest of runoff
Dismantling of old steel protect
Demolition of the old sills
Renewal of the sills
Preparation of the new weir field soles
Establishment of a bored pile foundation for the end beam
Establishment of a trailing bar below the weir 3, 4 and 5

Services
Billing sketch creation
Audit
Cost and schedule control
Supplementary audit
Contribute to the inspection
Monitoring the elimination of detected defects