Baierbrunn – Concrete repair weir phase II
Concrete repair weir – construction phase II
Construction time period:
8/2003 until 12/2003
Remedial measures
Disassembling an old defense contactor in the weir field 1
Excavation sheet pile production in the weir field 2
Concrete and surface restoration
Installing and removing the steel hydraulic engineering in the weir fields 1 und 2
Production of new weir field soles
irrigation filling in the underwater
Services
Billing sketch creation
Audit
Cost and schedule control
Supplementary audit
Contribute to the inspection
Monitoring the elimination of detected defects