vtg-logo
  • en
  • |de
  • MENU
  • Home
  • Company
    • Corporate Philosophy / Policy
    • Company History
    • VTG Team
    • Certification
    • Membership
    • Horizontal Directional Drilling (HDD)
  • Services
    • Pipeline Construction
      • District Heating / Cooling
      • Gas / Water
      • Sewer Construction
    • Microtunnelling
      • Open-Face Shield
      • Closed-Face Shield
      • Horizontal Directional Drilling (HDD)
      • Horizontal Auger Boring
    • Civil Engineering
      • Shafts
      • Structures
      • Bridges
      • Concrete Repair
    • Power Plants
  • Contact
  • How to reach us
  • Press / Current News
  • Partners
  • Employment
  • Line Construction
    • Fibre Optics
    • Cable Construction
  • Water Engineering
    • Weir Systems
    • Vertical Cut-off Walls
    • Dikes
    • Power Plants
  • Special Underground Construction
    • Earth-Retaining Structures
    • Injections
  • Additional Services
    • Safety Coordination
    • Traffic Management
    • Evidence
    • Project Control
    • Structural Inspections
  • Pipeline Construction
    • District Heating / Cooling
    • Gas / Water
    • Sewer Construction
  • Line Construction
    • Fibre Optics
    • Cable Construction
  • Water Engineering
    • Weir Systems
    • Dikes
  • Vertical Cut-off Walls
  • Microtunnelling
    • Open-Face Shield
    • Horizontal Auger Boring
  • Closed-Face Shield
  • Special Underground Construction
    • Injections
  • Earth-Retaining Structures
  • Civil Engineering
    • Shafts
    • Bridges
    • Concrete Repair
  • Structures
  • Additional Services
    • Safety Coordination
    • Traffic Management
    • Evidence
    • Project Control
    • Structural Inspections
    
 
  • Contact
  • How to reach us
  • Press / Current News
  • Partners
  • Employment
  • Home
  • Company
    • Corporate Philosophy / Policy
    • Company History
    • VTG Team
    • Certification
    • Membership
    • Horizontal Directional Drilling (HDD)
  • Services
    • Pipeline Construction
      • District Heating / Cooling
      • Gas / Water
      • Sewer Construction
      • Level 2
        • Line Construction
          • Fibre Optics
          • Cable Construction
        • Water Engineering
          • Weir Systems
          • Vertical Cut-off Walls
          • Dikes
          • Power Plants
    • Microtunnelling
      • Open-Face Shield
      • Closed-Face Shield
      • Horizontal Directional Drilling (HDD)
      • Horizontal Auger Boring
      • Level 2
        • Special Underground Construction
          • Earth-Retaining Structures
          • Injections
    • Civil Engineering
      • Shafts
      • Structures
      • Bridges
      • Concrete Repair
      • Level 2
        • Additional Services
          • Safety Coordination
          • Traffic Management
          • Evidence
          • Project Control
          • Structural Inspections
  • References
    • Line Construction
      • Pipeline Construction
      • District Heating / Cooling
      • Gas / Water
      • Level 2
        • Sewer Construction
          • Fibre Optics
          • Cable Construction
        • Water Engineering
          • Weir Systems
          • Vertical Cut-off Walls
          • Dikes
    • Microtunnelling
      • Open-Face Shield
      • Closed-Face Shield
      • Horizontal Auger Boring
      • Level 2
        • Special Underground Construction
          • Earth-Retaining Structures
          • Injections
    • Civil Engineering
      • Shafts
      • Structures
      • Bridges
      • Concrete Repair
      • Level 2
        • Additional Services
          • Safety Coordination
          • Traffic Management
          • Evidence
          • Project Control
          • Structural Inspections

Home | Services | Water Engineering | Power Plants


  • » zurück
  • » nach oben

Leistungen

Head quarter

VTG GmbH Ingenieurbüro
Richard-Reitzner-Allee 1
D-85540 Haar bei München

phone: +49 89 43 77 829 – 0
fax: +49 89 43 77 829 – 299
email:

» Contact Form
» How To Reach Us

Branch office /
Project office

VTG GmbH Ingenieurbüro
Freiheitstraße 124/126
15745 Wildau

phone:  +49 33 75 25 187 – 0

 

Certification

zertifikat-dekra

Our company is certified to ISO 9001:2015

Training company

bestaetigung-ihk

Our company is registered with the IHK Munich and Upper Bavaria as a training center.

We are registered with the branch as a training facility at the IHK Cottbus.

  • » Pipeline Construction
  • » Line Construction
  • » Water Engineering
  • » Microtunnelling
  • » Special Underground Construction
  • » Civil Engineering
  • » Additional Services
  • » Company
  • » Press / Current News
  • » Partners
  • » Employment
  • » data protection declaration
  • » Contact
  • » How to reach us
  • » Legal Information
  • » Print page
qr-code

Nehmen Sie die mobile Version mit!

© 2023 VTG GmbH

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

VTG GmbH
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.

Skip to toolbar
  • About WordPress
    • WordPress.org
    • Documentation
    • Support
    • Feedback
  • Log In