Munich – district heating Briennerstraße
Renewal of a district heating pipe – enclosing during operation
Vesting period:
Construction time period:
Pipe diameter:
xx
House connections:
Length of marked-out route:
01/2013 until 07/2013
08/2013 until today
DN 300 preinsulated pipes including transformation into former steam lines
5 pcs
210 m
Services
Preliminary
Implementation planning for underground and pipeline construction
Static tube
Tender of performance directory
Safety and health coordination
Traffic planning
Details
Implementation and integration into existing two shafts
Construction / enclose in operation
High traffic
Working in the track area (Tram)